Thirdly, the risk of damage to the building due to sewer failure is not excessive in the case of building control, which will require both details of the proposal and a copy of the construction by agreement provided by the sewer authority. Please send an email with your full detail after JC all background information relevant to an offer, including proposal plans, pipeline plans, surveys, photos, planning conditions or any other relevant item for the proposed building permit. Sometimes problems arise when owners try to sell their property, which is built in part or entirely through a public channel. Conservatories and extensions are the usual criminals. If a Build Over Agreement was not obtained when the work was done, then the water company has the legal right to enter the land to reach the canal, even if that means demolishing the building above the canal. However, if possible, the water company will avoid the damage and look for other ways to enter the sewers, but the risk remains. If a construction agreement has been reached, the water company has no right to remove or demolish the structure above the sewers. The other possibility is that the seller will provide the buyer with compensation insurance to protect against financial losses resulting from the construction of the property through a public sewer. It is the fastest and cheapest option, but whether or not insurance is available depends on the circumstances of each case.

If no construction agreement has been reached, the vendor should have a sewer line review and the records forward to the water company. If the water company is satisfied that the sewers are in good condition, they will give a consolation letter confirming that the sewers are in satisfactory condition. The comfort letter generally satisfies the buyer and its mortgage lender that the Water Company will not take any action to demolish the insulting structure over the public sewers. First of all, that building, or enlargement or working with the chassis- If you want to build by a canal, you need a construction by agreement. This is necessary if you plan to build a building, extension, support construction or similar work nearby or directly on an existing canal. The distance from the applicable sewer depends on several factors, including the depth of the sewers, as the sewers are critical, etc. although it is usually 3m. It depends on the individual situation, but for an application that can be built using a public sewer, it is likely that you need the following: Construction agreements are a complex area both technically and legally, and those who are not professional developers should consider getting professional advice.

A professional civil engineering consultant, with particular experience in building contracts, sewers and foundations, should be put in place. The cost of damage to sewers or foundations, without agreement or agreement, can be prohibitive.